Georgetown, GY 🇬🇾 Medium Airport Scheduled Service
SYCJ
GEO
95 ft
GY-DE
GPS Code: SYCJ
Local Code: SYGT
Location: 6.49855° N, -58.254101° E
Continent: SA
Type: Medium Airport
Loading weather data...
Loading current delay data...
Loading historical delay data...
Destination | City | Country | Flight # | Distance | Airline | Actions |
---|---|---|---|---|---|---|
Loading...
Loading routes...
|
Check real-time flight schedules and status information below.
Designation | Length | Width | Surface | Status |
---|---|---|---|---|
06/24 | 7448 ft | 148 ft | ASP | Active Lighted |
11/29 | 5002 ft | 148 ft | ASP | Active |
Type | Description | Frequency |
---|---|---|
APP | TIMEHRI APP | 119.4 MHz |
GND | GND | 121.7 MHz |
TWR | TIMEHRI TWR | 118.3 MHz |
Ident | Name | Type | Frequency |
---|---|---|---|
TIM | Timehri | VOR-DME | 113500 kHz |
TIM | Timehri | NDB | 356 kHz |
UIT | Timehri | NDB | 305 kHz |
Taxis are typically available outside the arrival terminals.
Multiple rental car companies may have counters at this airport.
Buses or trains may connect the airport to the city center.
Reply to @pilotfan21: all of the above is done!
Only worry about safety, this has no price
Runway, ils, radar control.
New terminal and bays can wait,
I agree that they should increase the runway to at least 10,000ft and upgrade the airport with boarding bays and add another terminal so more airlines will have accommodations Into Cheddi Jagan which will allow aircrafts like the 747 jumbo jet and the largest aircraft airbus a380, and will have more flights from Pearson International. i also recommend that they install an (Instrument Landing System) on every runway so aircrafts can do ILS landing in foggy conditions and low visibility.
The government is planning to extend the runway to 10,000ft and build a new terminal but it has not been approved yet. Look it up @GuyanaTimesGy.com
Increase the runway it's like what ? 5700 it's like one and a half mile thats not big enough
I agree 100% with this person that said increase the length of the runway and they need boarding bays
Increase the length of the runway to accommodate larger jets. Also upgrade to international standards with boarding bays like all other international airports eg Piarco has those, so passengers don't have to climb down those antique stairs, then walk to the terminal building etc. The planes can just pull up to the bays and passengers get off and walk into the airconditioned building and straight to customs and immigration.