Ozamiz, PH 🇵🇭 Medium Airport Scheduled Service
RPMO
OZC
75 ft
PH-MSC
Loading...
Loading...GPS Code: RPMO
Local Code: Not available
Location: 8.17851° N, 123.842003° E
Continent: AS
Type: Medium Airport
Keywords: Barangay Labo Ozamiz Misamis Airfield
Loading weather data...
Destination | IATA | City | Aircraft Type | Airline | Route Map | Details |
---|---|---|---|---|---|---|
Loading...
Loading routes...
|
Designation | Length | Width | Surface | Status |
---|---|---|---|---|
03/21 |
5720 ft | 148 ft | PEM | Active |
Tricycles (motorized motorcycles with a sidecar) are the primary for-hire vehicles available directly outside the airport terminal. They function as local taxis. Fares are negotiable and should be agreed upon with the driver before starting your trip. Standard four-wheeled taxis are generally not present at this airport.
There are no major car rental company counters located at Labo Airport. Car rentals can be arranged in advance through local providers in the nearby capital city of Daet. It is recommended to pre-book and coordinate with the rental company for airport pickup.
There are no scheduled public buses or jeepneys that directly service the airport terminal. To access public transit like jeepneys or UV Express vans, you will need to take a tricycle from the airport to the main highway or to the central transport terminal in Daet.
Since the opening of Ozamiz airport last July 2007, Air philippines and PAL express have offered flights to Manila and Cebu respectively. Passengers and cargoes have increased significantly due to its strategic location. Ozamiz airport serves the areas of Ozamiz city, Oroquieta city, Tangub city, parts of Lanao del Norte and Zamboanga del Sur. I heard that Cebu Pacific Air is also flying to Ozamiz in September 2008 by offering Manila flights via Cebu using their ATR 72 plane. The entry of another airline in Ozamiz will definitely boost travel, business and tourism in Misamis Occidental and its neighboring provinces. Works for the improvement of the airport already started in the first quarter of 2008. Expansion of the tarmac, construction of a new passenger arrival building with a luggage carousel/conveyor, installation of the baggage scanner and walk-through detector and car park fencing are almost finished. Ozamiznons are eagerly awaiting for installation of runway lights and extension/expansion of the runway so that bigger aircrafts can land at the airport.