Xiang'an, Xiamen, CN 🇨🇳 Closed Airport
ICAO
CN-0399
IATA
-
Elevation
- ft
Region
CN-35
Local Time
Loading...
Loading...GPS Code: Not available
Local Code: Not available
Location: 24.5556° N, 118.3534° E
Continent: Asia
Type: Closed Airport
Help fellow travelers by sharing your experience at Xiamen Xiang'an Airport (under construction). Tips are reviewed before publishing.
See what travelers are saying about Xiamen Xiang'an Airport (under construction) from online reviews
AI-generated summary based on publicly available traveler reviews
Researching traveler experiences online...
No community tips yet for Xiamen Xiang'an Airport (under construction).
Be the first to share a helpful tip for fellow travelers!
Loading weather data...
| Designation | Length | Width | Surface | Status |
|---|
| Type | Description | Frequency |
|---|
Not Applicable - This airport has never been open.
Not Applicable - The facility is a new airport currently under construction, not a closed one. The premise that it is a 'closed airport' is incorrect.
The site is an active, large-scale construction zone. The project involves extensive land reclamation off the coast of Dadeng Island in the Xiang'an District. As of the early 2020s, major land reclamation work has been completed, and construction of the terminal buildings, runways, and other infrastructure is underway. The ICAO code 'CN-0399' is a non-official, placeholder identifier used in some databases for sites that do not yet have an official ICAO code.
The airport has no operational history as it is a new development. Its significance is entirely future-oriented. It is being built to replace the existing, capacity-constrained Xiamen Gaoqi International Airport (XMN/ZSAM). Upon completion, it is planned to be a major international aviation hub for Southeast China, part of the 'Maritime Silk Road' initiative. It is designed to handle a significantly higher volume of passengers and cargo, with initial plans for two runways and a capacity of 45 million passengers per year, eventually expanding to four runways and a capacity of 85 million passengers.
The airport is not reopening; it is awaiting its initial opening. Construction has faced various delays, but the project is a national priority. The current projected opening date is tentatively set for 2026 or 2027, though this timeline is subject to change based on construction progress. Once open, it will take over all civil aviation operations from Xiamen Gaoqi International Airport.